Greenway - SkillBridge Program - On The Job (OJT) Training
Maintenance Technician
Maintenance Technician: Performs routine maintenance tasks, troubleshooting and repairing mechanical and electrical systems, and ensuring compliance with safety standards. Strong technical background, excellent problem-solving skills, and the ability to work independently or as part of a team. Responsibilities include maintaining mechanical, electrical, plumbing, Door Systems, and HVAC systems, performing preventative maintenance, and responding to maintenance issues promptly to minimize downtime.
See full description of desired MOCs in the "Other" block below.
TS/SCI Clearance Required. High school diploma or GED equivalent; technical diploma or certification is a plus. Vocational training or apprenticeship in a relevant field preferred. Previous years of experience in maintenance or a related field is preferred by not mandatory.
Navy: MM-Machinist's Mate, CE-Construction Electrician, UT-Utilitiesman, EM-Electrician's Mate, EN-Engineman. Air Force: 3E0X1-Electrical Systems AFSC, 3E0X2-Electrical Power Production AFSC, 3E4X1-Water and Fuel Systems Maintenance AFSC, 3E1X1-HVAC & Refrigeration AFSC. Army: 91D-Tactical Power Generation Specialist, 12P-Prime Power Production Specialist, 12H-Construction Engineering Supervisor, 12R-Interior Electrician, 12K-Plumber.
No reviews yet. Reviews unlock for candidates 30 days after adding this program to their tracker — integrity over volume.
Interview prep for this program▸
- ▸ "How many of your past SkillBridge interns received full-time offers?" — a serious program knows the number.
- ▸ "Who will my day-to-day mentor be, and what does week one look like?"
- ▸ "The listing says 31 - 60 days — can that flex to my approved window if my command shortens it?"
- ▸ "Is relocation expected for a full-time offer, or can I convert where I am?"
- ▸ "You list SEE, FULL, OF — what did interns from those specialties end up doing here?"
- ▸ Confirm the eligibility notes above — ask exactly what they need from you and when.
- ✓ Your projected start window and separation date (from your profile)
- ✓ Your command's approval status — even "packet drafted" signals you're serious
- ✓ Your civilian-translated resume bullets (generate them here)
- ✓ A written training-plan ask — you'll need it for your packet anyway